top of page

MENU

Our Projects

We bring our innovative touch to every project, proving that nothing is impossible.

At Cassidy Systems, we want to showcase our projects both big and small to provide an insight to our capability. We thank all of our customers for their continued support and for providing us the opportunity to work with them on their unique projects.

01

Traincare depot EVSE survey's

Cassidy Systems, as RISQS Audited contractor, working with Flexible Power Systems & South Western Railways to provide in-depth insight to electrical infrastructure to determine the capability to scale EV transition at their train care depots.

02

Solar PV Maintenance

Cassidy Systems working with Eureka Science and Discovery to undertake Electrical maintenance whilst being able to determine safety, and performance capability of their 198 panel array at their new facility in Wallasey.

03

Wireless charging technology.

Cassidy Systems install's it's 2nd Wireless DC Rapid Charger for Waitrose and Partners as part of a collaborative project to support their green fleet and home delivery team.

04

Electrical Filtration (TEMPEST)

Cassidy Systems working closely with EEP Filters to support the rollout of their product line for Installation and on-site support for their Filters range.

05

Dual home charging

Cassidy Systems installs two home chargers to allow their client the ability to charge two vehicles simultaneously without effecting their incoming home supply by the use of static and dynamic load management.

06

Employee and Fleet charging

Cassidy Systems installs electrical charging infrastructure for Pump Logic to support their growing employee and fleet vehicles, supporting their growth and transition to EV.

07

Council Charging for Fleet

Cassidy Systems replaces non-working charging stations at the City of Edinburgh Council to allow their new fleet of Vivaro-e's to charge effortlessly at their council building.

08

Wireless Charging at Edinburgh's Heriot Watt University.

Cassidy Systems install's one of the UK's first wireless rapid DC charger utilising the CCS communication method, working with Flexible Power Systems.

09

Battery storage reduces peak demand at Heriot Watt University.

As part of our initial project with Flexible Power Systems, we return to install a bespoke battery storage system to provide power injection for the wireless charging equipment due to peak demand on-site.

bottom of page