top of page
Traincare Depot EVSE Survey’s
Summary
Cassidy Systems, provided an in-depth insight to electrical infrastructure to determine the capability to scale EV transition at their train care depots at Wimbledon and Farnham. During our time at SWR working closely with FPS included the ability to conduct both non-intrusive and intrusive electrical surveys providing electrical LV schematics and Civil layout drawings of the site to compliment the next stage for technical submission
Location
2023
End Client
We are a RISQS Audited and Verified contractor, providing the ability to work on rail infrastructure following closely to Network Rail standards.
Additional information
Wimbledon, London UK & Farnham, Surrey UK
Completion Year
South Western Railways
bottom of page