top of page

MENU

Traincare Depot EVSE Survey’s

Summary

Cassidy Systems, provided an in-depth insight to electrical infrastructure to determine the capability to scale EV transition at their train care depots at Wimbledon and Farnham. During our time at SWR working closely with FPS included the ability to conduct both non-intrusive and intrusive electrical surveys providing electrical LV schematics and Civil layout drawings of the site to compliment the next stage for technical submission

Location

2023

End Client

We are a RISQS Audited and Verified contractor, providing the ability to work on rail infrastructure following closely to Network Rail standards.

Additional information

Wimbledon, London UK & Farnham, Surrey UK

Completion Year

South Western Railways

bottom of page